Summary
A SECTION of the A403 coast road from Aust to Pilning is set to be closed for two nights to allow work to be carried out on a motorway bridge.
The southbound section of the road from the Severn Bridge to the Crosshands Road junction in Pilning will be closed from 9pm-5am on March 15-16 and again on March 16-17.See the full content of this document
Extract
Road Closes for Work On Bridge
Diversions w...
See the full content of this document
Sponsored links
